Harvora™ decision brief

Harvest timing decisions

Plan maturity windows from heat-unit accumulation.

Direct answer

What this supports

Thermal-time accumulation provides uncertainty-aware timing for harvest planning.

Intended for New Zealand growers and orchard operating teams.

Evidence and method

How the signal is formed

Heat-unit maturity timing is presented as a probability or bounded operating signal, with the evidence boundary kept beside the decision.

Evidence grade: ESTIMATE

Weather-benchmark measured today; every grower outcome logged in the product feeds the field benchmark it is measured against next.

Boundary

How to read this evidence

The heat-unit timing surface is ready for harvest planning; measured maturity, pick-date and packout records can add orchard-specific calibration.

Sources and related evidence

Published 25 August 2026 · Last reviewed 25 August 2026 · Harvora technical review

Apply it to your operation

Work with us

Discuss a grower pilot