Harvora™ decision brief
Harvest timing decisions
Plan maturity windows from heat-unit accumulation.
Direct answer
What this supports
Thermal-time accumulation provides uncertainty-aware timing for harvest planning.
Intended for New Zealand growers and orchard operating teams.
Evidence and method
How the signal is formed
Heat-unit maturity timing is presented as a probability or bounded operating signal, with the evidence boundary kept beside the decision.
Evidence grade: ESTIMATE
Weather-benchmark measured today; every grower outcome logged in the product feeds the field benchmark it is measured against next.
Boundary
How to read this evidence
The heat-unit timing surface is ready for harvest planning; measured maturity, pick-date and packout records can add orchard-specific calibration.
Sources and related evidence
Published 25 August 2026 · Last reviewed 25 August 2026 · Harvora technical review
Apply it to your operation